The Morila Mine s main ore body was depleted in 2009 In 2014 gold produced at the mine was from stockpiled ore pushback ore subpits designed to generate a mine s optimal pit limits and extraction sequence and material from the tailings storage facility The mine produced a total of 3 430 kg in 2014 compared with 4 411 kg in 2013